Post

LIMS System Roadmap

LIMS Functional Specification

Focus Areas

  • EMC
  • Safety
  • Energy Efficiency
  • Software

1. Pre-Testing

Data Model

1.1 Sample Reception and Registration

  • Sample Registration: Generate and register unique identifiers for new samples.
  • Sample Barcode Generation: Generate barcodes for sample identification and tracking.
  • Client Information Entry: Input and manage client information.

1.2 Test Request and Planning

  • Test Request Management: Receive and manage test requests.
  • Test Planning: Schedule and plan tests.
  • Test Item Definition: Define test items and required test procedures.
  • Test Capability Verification: Determine if the requested test can be handled based on lab capabilities and focus areas.
  • Project Code Creation: Generate a unique project code for each test request.

1.3 Sample Preparation

  • Sample Classification and Labeling: Classify and label samples.
  • Sample Condition Verification: Verify and validate sample conditions.
  • Pre-Test Sample Processing: Perform necessary pre-test sample processing.

1.4 Test Standard Management

  • Test Standard Definition: Define and manage various test standards
  • Standard-Specific Data Format Configuration: Define raw data formats according to each test standard.
  • Standard Selection and Application: Select applicable standards during test requests.

1.5 Project History and Timeline Management

  • Project History Tracking: Maintain a history of all actions and updates for each project.
  • Timeline Management: Manage and display timelines for each project process.

2. During Testing

Data Model

2.1 Test Execution

  • Test Procedure Management: Manage test procedures and protocols.
  • Experimental Data Collection: Collect experimental data automatically and manually.
  • Equipment Integration: Integrate with laboratory equipment for automatic data input.

2.2 Data Management

  • Experimental Data Storage: Securely store and manage experimental data.
  • Data Integrity Verification: Verify data integrity and maintain audit trails.
  • Real-Time Data Monitoring: Monitor experiment progress and data in real-time.

2.3 Standard-Specific Data Collection

  • Standard-Specific Data Entry Screens: Provide data entry screens that vary according to the selected test standard.
  • Automatic Format Conversion: Automatically convert raw data formats according to the standard.
  • Data Format Verification: Verify that collected data conforms to the standard.

2.4 Project History and Timeline Updates

  • Ongoing History Tracking: Continuously update the project history with all test-related actions.
  • Timeline Updates: Continuously update project timelines with test progress.

3. Post-Testing

3.1 Data Analysis and Report Generation

  • Data Analysis Tools: Provide tools for data analysis and visualization.
  • Report Generation: Automatically generate test result reports.
  • Report Approval and Distribution: Manage report review, approval, and distribution.

3.2 Result Management

  • Test Result Storage and Retrieval: Securely store and retrieve test results.
  • Result Review and Approval: Manage the review and approval process for results.
  • Client Report Dispatch: Send test result reports to clients.

3.3 Sample Storage and Disposal

  • Sample Storage Management: Manage the location and condition of stored samples post-testing.
  • Sample Disposal: Manage the disposal process for samples after testing is completed.
  • Storage Period Configuration: Set and manage sample storage periods.

3.4 Standard-Specific Report Generation

  • Standard-Specific Report Templates: Provide report templates according to each test standard.
  • Report Review and Approval: Manage the review and approval process for standard-compliant reports.
  • Standard Compliance Verification: Verify that reports comply with the relevant standards.

3.5 Project History and Timeline Finalization

  • Final History Record: Finalize the project history with post-testing details.
  • Final Timeline Update: Finalize the project timeline with post-testing milestones.

4. Settings

4.1 User Management

  • User Account Creation and Management: Create, modify, and delete user accounts.
  • User Role and Permission Settings: Define and manage user roles and permissions.

4.2 System Configuration

  • System Environment Settings: Configure system operational settings (e.g., timezone).
  • Notification and Alert Settings: Configure system notifications and alerts (e.g., email, other service).

4.3 Test Standard Management

  • Test Standard Definition and Updates: Define and periodically update test standards.
  • Standard-Specific Data Format Settings: Configure data formats according to each test standard.
  • Test Standard Application Management: Manage the application and enforcement of test standards.

4.4 Equipment Management

  • Equipment Registration and Tracking: Register and track laboratory equipment.
  • Equipment Data Format Definition: Define data formats for each piece of equipment.
  • Equipment Maintenance and Calibration: Manage maintenance and calibration schedules.
  • Equipment Integration Settings: Configure settings for integrating equipment with the LIMS system.

4.5 Data Backup and Recovery

  • Data Backup Configuration: Configure regular data backups.
  • Data Recovery Procedures: Define and execute data recovery procedures.

4.6 System Integration

  • Equipment and Device Integration Settings: Configure integrations with laboratory equipment and devices.

4.7 Security and Audit

  • Security Settings and User Access Control: Manage system security settings and user access controls.
  • Audit Trails and Log Management: Manage audit trails and system logs.
This post is licensed under CC BY 4.0 by the author.

Trending Tags